From a bare shell to a space somebody can move into

White-box preparation and complete commercial tenant buildouts — one sequence, and a project can stop anywhere along it.

The sequence

Where your project stops decides what it is called

White box and tenant improvement are not different kinds of work. They are the same work, finished at different points — which is why they belong on one page.

A finished commercial reception and waiting area with a dark reception counter, a row of tan armchairs along a full-height window wall, and illuminated rectangular ceiling fixtures
01

Shell

Bare structure, or a suite stripped back to it. Nothing in here is finished and nothing is committed yet.

02

White box

Demising walls, a level floor, a finished ceiling, utilities stubbed to code and an ADA-compliant restroom. A landlord's delivery condition, handed over plain so a tenant's own fit-out can start.

03

Tenant buildout

The full interior: partitions, mechanical, electrical and plumbing, finishes, millwork and fixtures, through permitting and inspections to a space that can be occupied.

Who it is for

Landlords, developers and tenants preparing space

A landlord or developer owes a tenant a space in a defined condition, and the lease exhibit is the finish line. Getting there on the agreed date is what keeps a tenancy on schedule and rent commencing when it was supposed to.

A tenant taking new space has the opposite problem: an empty suite and a date by which the business has to be operating out of it. Same building, same trades, a different definition of finished.

Paloma runs either, and routinely runs both ends of the same suite.

Scope

What the work covers

  • 01

    Demolition and shell preparation

    Clearing out what is there and getting the space ready to build from.

  • 02

    Demising walls, level floor and finished ceiling

    The white-box shell: tenant boundaries, a floor flat enough to take any finish, and a ceiling ready to hand over.

  • 03

    Framing, drywall and ceilings

    Where the layout stops being a drawing and becomes rooms you can walk.

  • 04

    Mechanical, electrical and plumbing coordination

    Ductwork, power and plumbing sequenced so they agree with each other and the ceiling.

  • 05

    Storefront, entry and ADA-compliant restroom

    The entrance the lease calls for, and a restroom built to meet accessibility requirements.

  • 06

    Finishes, millwork and fixtures

    The surfaces, cabinetry and fittings a tenant sees on the first day.

  • 07

    Permitting and inspections

    Submittals and coordination with the city through approval.

  • 08

    Punch list to certificate of occupancy

    The closing list worked down until the space can be occupied.